Installation and Manufacturing

Optical Fiber Furnaces – Ease of Installation and Manufacturing

Furnace Reliability, Consistency and Simplicity

We believe that an optical fiber furnace system should be ‘Designed for Production’. The system should:

  • Provide reliable operating performance
  • Give consistent, constant response
  • Be simple to operate and simple to install

In addition to technical consideration our customers demand that we can support their production business goals. To this end we know that in today’s world it is important that the furnace system can:

  • Fit on any draw tower
  • Interface with any control system
  • Provide a system that is easy to operate and reliable

Stanelco systems meet all these business requirements! Stanelco Engineers will be pleased to discuss any questions you may have.

Simple Specification

Our approach is to offer a design which meets both your needs now and your needs in the future. This means cost-efficiency for your long-term production, as preforms get bigger and the furnace set up needs customising.

The Design, Build and Install steps require a few simple pieces of information to get started as set out below.

Customer manufacturing requirements

  • What preform size to be processed now?
  • What preform size to be processed in near future?

Customer installation and control requirements

  • The tower dimensions to fit the furnace system to.
  • The mounting plates needed.
  • Which control interface is to be used?

Stanelco Furnace System - Build and test

  • Stanelco build, test and deliver the system to meet your turnkey requirement.

Stanelco engineer commissioning

  • A Stanelco engineer works with your team to integrate the furnace system with your equipment

Future production. Our system will provide:

  • Precise, automatic control of the required temperature.
  • Easy upgradeability to new preform sizes as they become available

We look forward to meeting your manufacturing requirements!

For further information please email: